Thirty-eight units,four weeks early.

Helvetia Immobilien bought a plot the zoning had been shrinking for six years. The envelope came out of the feasibility study rather than the other way round, and the cost plan that won approval is the one that got built.

Client

Helvetia Immobilien

Typology

Residential, 38 units

Area

11,200 m²

Completed

Zürich, 2024

The brief

A plot that got smallerevery time we measured it.

Three setback revisions in six years had taken the buildable envelope down by a fifth. The developer’s own consultants had priced two schemes against the old figures, and both came back over budget at tender — not because the design was extravagant, but because it was drawn against a plot that no longer existed.

We re-ran the zoning envelope first and drew nothing until the number held. Thirty-eight units fit under the current setbacks with a metre to spare, and that metre is why the scheme cleared the planning hearing without a single amendment.

The record

What it came to.

38

Units delivered

11,200

Square metres

26

Months on site

1.4%

Of contract value in variations

Two documents

The set, and whatit became.

section-architecture-building-2

The tender set

1,240 sheets · issued March 2022 · priced without a single request for information

section-architecture-building-5

Unit 3.04

84 m² · handed over June 2024 · snag list closed before the keys

Credits

Who was on it.

Client

Helvetia Immobilien AG

Contract

Single contract, all four disciplines

Partner in charge

Matthias Reber

Structure

Bänziger Partner AG

Contractor

Implenia Schweiz AG

Status

Handed over, June 2024